Administration > Dashboard
Dashboard
Figure 93: Dashboard with storage by project and remaining storage included in package
The dashboard shows the technical details being interesting for domain administrators and project managers, such as:
monthly base costs
exceeded download traffic cost
exceeded processing budget cost
total cost
Select the month on the drop down menu at the top right corner of the page, to view the usage data for the particular month.
Click the Refresh button to update the overview.
Package Details
Shows the details of your SCENE WebShare Cloud contract.
Usage: Overview
Usage: Overview shows storage and download data in values per month.
Used Download Traffic shows the download traffic per month in gigabyte, and in percentage.
Storage Used shows the amount of storage being used in the current month, and a percentage value which indicates how many percent of the maximum value has already been used. The amount is not shown in real-time, it is calculated several times a day as a snapshot.
Storage Used, By Project shows the data of last storage measurement—if last storage measurement was done during a project upload, the value is not final but will increase until upload is finished.
Users shows the number of users which are registered for your domain.
Usage: Traffic details
Daily Download Traffic Usage Chart (GB)
This diagram shows the amount of data which was downloaded per day, during a month. If you hover over one of the chart bars, a field with detailed data will be shown.
Daily Upload Traffic Usage Chart (GB)
This diagram shows the amount of data which was uploaded per day, during a month. If you hover over one of the chart bars, a field with detailed data will be shown.
Accumulated Traffic Usage Chart (GB)
Shows an accumulation of the download and upload charts above. If you hover over one of the chart bars, a field with detailed data will be shown.
Usage: Storage details
Shows the maximum storage size of each day. Storage used (Maximum of month) means the amount of storage used at a single point in time during the month.
For example, if on the 1st day of a month, you have 100 GB, then 200 GB on the 2nd day, then you delete a project and have 50 GB for the rest of the month, the value will still be 200 GB.
Storage used (Maximum of month) is relevant for the payment (compared against storage size of subscription).
Note: If the used storage space or download traffic per month exceeds the base package limits, additional charges will apply.
Usage: Processing Budget Details
The table shows the incurred costs for executed operations and pending operations, Note that the costs are currently given in the unit of scans. There are also charts showing
Daily processing budget usage
Accumulated processing budget usage
Pending operations (only when the current month is selected)
Executed operations